Call now!

Apart from the ear-aching performance by Meat Loaf at the 2011 AFL Grand Final halftime show, the MCG’s revitalised speaker system has helped crowds get even more immersed in the entertainment than ever. The sound system was replaced when  Great Southern Stand, now the Shane Warne Stadium (and deservedly so, what a legend!), was rebuilt back in 1992, with Southern Electronic Services transformers supplying power solutions to the groundbreaking PA system.

For other projects using Southern Electronic Services transformers, visit our projects page.

great south stand


SES Projects

Next Post

Step Down transformers for Tea Love

November 15, 2022

Other News


Step-Down Transformers

A Smarter Way to Tackle Long Cable Runs

Industrial Transformers SES Projects

Step-Up / Step-Down Transformers: A Smarter Way to Tackle Long Cable Runs When customers ask about long cable runs—say, hundreds of metres from a generator or switchboard to remote equipment—one of the first concerns is voltage drop and the cost of heavy-duty cabling. And they’re right to be concerned: oversized cable to carry 415V over…

VSDs & Isolation Transformers

VSDs & Isolation Transformers – What / When / Why

SES Projects Industrial Transformers

Why Use an Isolation Transformer with a VSD/VFD? Variable Speed Drives (VSDs) — also known as Variable Frequency Drives (VFDs) — are a powerful tool for improving efficiency and control in electric motor systems. But while VSDs offer great performance benefits, they can also introduce electrical noise, harmonics, and safety concerns that need to be…